Description

* Career Objective

*Employment History

*Academic Qualification

*Training Summary

*Career and Application Information

*Extra Curricular Activities

*Language Proficiency

*Personal Details

*Reference (s)

Education

Mymensingh Polytechnic Institute

1997 to 2000 Diploma in Engineer

Chalak char High School

1995 to 1997 Secondary School Certificate

Experience

Doreen Power Generations & Systems Ltd

March 01, 2009 - Continuing Assistant Shift Engineer

Duties/Responsibilities:

Reporting to the Plant Manager. Operation, Trouble shooting & Maintenance of 22 M.W Power Plant power by 8 GE Jenbacher gas engines of model JGS 620-GS NL. Working Instruments: PLC (Jenbacher DIA. NEXT with distributed I/O), AVR (BASLER DECS 100), Electronic Governor (PANDOROS, Heinemann), Generator Protection Relay (MRG3), Differential Protection Relay (Wood Word ESDR-4), Ignition Controller (Wood Word IC920). Calibration and maintenance of various types of control actuators, Knock Sensor, KLS98-interface card, Pressure Transmitter, Flow Transmitter, Temp Transmitter, Electronic Diff: Pressure/ Pressure transmitter, Flame detectors, Solenoid valve, Magnetic Pickup, Pt100, Pt1000, Thermocouple, Pressure switches, Pressure gauges, Proximity. Maintenance, repair and troubleshooting 33 KV, 11 KV & 400 V switchgear component and Good concept about Step-Up Transformer (15MVA), Distribution Transformer (750KVA) protection, Low Voltage MCC and Switchgear protection system, vast knowledge on coordination between the protection systems. Maintenance & Operation of Gas Control Station (TBS & RMS).
Coordination with NLDC, PGCB, BPDB Distribution, Feni PBS, GTCL & BGSL. Also Maintaining Detail Log Sheet & Record of all Activities.

Viyella Tex spinning Ltd.

July 01, 2008 - February 28, 2009 Asst. Engineer

Duties/Responsibilities:

Working as a Asst. Engineer (Operation & Maintenance) in 5.06MW Power House, my measure responsibility are Power Distribution, Daily report and other parameters Observation and operation. engine overhauling i.e. valve and seat grinding, connecting rod bearing and main bearing removal and installation, piston and liner overhauling, engine auxiliary installation, pipeline installation, pressure testing of pipelines, panders governor (heinzman series) tuning, motor starting system etc. Also expert on all types of pump maintenance, all types of lube–oil filter, fuel filter, Jacket water cooler, lube-oil cooler, lube-oil separator, intercooler, oil bath filter cleaning and re-installation process.

Roshawa spinning Mills Ltd.

February 01, 2003 - June 30, 2008 Asst. Engineer

Duties/Responsibilities:

Working as a Asst. Engineer (Operation & Maintenance) in 5.28MW Power House, my measure responsibility are Power Distribution, Daily report and other parameters Observation and operation. Engine overhauling i.e. valve and seat grinding, connecting rod bearing and main bearing removal and installation, pipeline installation, pressure testing of pipelines, motor starting system etc. Also expert on all types of pump maintenance, all types of lube–oil filter, fuel filter, Jacket water cooler, lube-oil cooler, lube-oil separator, intercooler, oil bath filter cleaning and re-installation process.

Thermax Melange Spinning Mills Ltd

April 01, 2001 - January 31, 2003 Sub- Asst. Engineer

Duties/Responsibilities:

Power Distribution, Daily report and other parameters Observation and operation. Gas Generator (Waukesha) 900KW, 1125KVA. (06 Unit).