Description
Experienced mostly in Project Planning, Project Management, Construction Management, Construction Supervision, Quantity Surveying, Contracting, Outsourcing and Contract Management, Project Control, Cost/ Budget Control & Management, TQM, Supply Chain Management and Project Delivery in building construction (residential and commercial) and turn key industrial projects sector. Successfully Managing Quantity Surveying and Controlling Cost/ Budgets along with bills and other expenses for about 45 nos. of high-rise building construction and several land development Projects. Successfully completed and handed over completed and clean site of benchmark Project Skyline, the 2nd line GLT Factory of British American Tobacco Bangladesh at Kushtia as Resident Project-in-Charge. Successfully worked as Resident Project-in-Charge for Vintage Denim Studio of ABA Group at Ishwardi EPZ, the first LEED Certified Platinum rated Green Factory and one of the largest RMG Factory Complex in Bangladesh. Successfully designed firefighting approval plan for 20 storied HRD Building, DPHE, Dhaka, approved by Firefighting Department, GoB. – Innovative, results-oriented and goal-focused technical management professional with excellent communication capability and can successfully deliver exceptional customer services to all clients. – Proactive ability to exercise a common-sense while utilizing creative problem-solving techniques, utilization of critical thinking skills and effective communication expertise & demonstrated ability to achieve targeted goals, meet budgets, excel and constraints in challenging situations. – Capable of leading, developing and successfully implementing processes and guide down-line that can formulate appropriate strategies while helping to meet organizational goals. – Computer skills include: Windows based Microsoft packages, MS Project, ERP, STAAD Pro, ETABS, AutoCAD and Photoshop.
Education
-
Bangladesh University of Engineering and Technology
- 2000-2008 Civil Engineering
-
Notre Dame College.
- 1998-2000 Science, HSC
-
Ansar VDP School & College
- 1988-1998 Scienc, SSC
Experience
-
Rupayan Housing Estate Ltd.
-
2015
Assistant General Manager and Head of Technical Outsourcing & Contracting
•Leading the process of Technical Outsourcing/ Procurement for different Project works.
•Overseeing Contract Administration/ Contract Management.
•Participating in the Contract Management and Contract Administration Process.
•Interpreting Design and Drawings and preparing Technical Specification for different types of complex work as per Design and Drawings.
•Formulating Contractor/ Vendor Assessment/ Evaluation process.
•Formulating Standard Format of Different type of documents i.e. Contractor’s Declaration Form (CDF), CS, Notes etc.
•Leading/ Coordinating the Contractor Evaluation Process.
•Suggesting changes in Designs/ Drawing as per practical requirement
•Shortlisting of Vendors and Preparing CS (Comparative Statement) for Complex and Large Budget/ Complex Work.
•Guide lining Vendors about work methodologies as per Design, Drawings and Technical Specification.
•Analyzing the technical viability of the work methodology and suggesting alternatives (if any).
•Checking for Technical Analysis for Complex type of Works.
•Leading the Process of CS and playing the major role in LCSC (Labor Contractor Selection Committee) meetings and processes as Deputy Leader of the Committee.
•Guiding the Team for documentation of CS (Comparative Statement), Work Approval Note, Different Inter Office Memo, BoQ (if any), Work Orders, Deed of Agreement and other Contract related document..
•Coordinating for Dispute Resolution / Settlement Issues, Arranging/ Coordinating Internal/ External/ Cross meetings negotiation and ensuring the settlement of disputes raised based on terms, conditions, rates and other clauses in the Work Orders and Agreements.
•Checking for Compliance of the Orders with the Demand Note from the Projects.
•Leading/ Coordinating the Vendor/ Supplier/ Contractors’ Interviewing Process.
•Negotiating for Price and Payment Mode.
•Preparing, Signing and Issuing Work Orders and Signing Contracts. -
Rupayan Group
-
2013
Manager/ Head of QS, Technical Control & Bills
•Leading a handsome team of nine engineers, supervising their works, overall planning, monitoring and evaluation of departmental activities (Quantity Surveying, Contracting, Technical and financial analysis, Costing, Billing etc.)
•Leading the total process of Quantity Surveying regarding Construction of High-rise Building Projects (About 45 nos.) and utilization of survey data in continuous feasibility control.
•Associating management in the process of complex techno-financial decision making.
•Settling the general, complex and disputed issues regarding budgets and bills.
•Communicating with different Company Heads and HoDs of the group for resolving the issues related to operation and finance.
•Confirming fulfillment of all types of compliance issues and certifying all bills and IPCs, budgets, requisitions and adjustments(specially for construction) along with certifying all types of Payment Advices from Accounts departments of all companies under Rupayan Group.
•Providing technical assistance for operational management of Rupayan Housing Estate Limited being a part of Implementation Team for different Residential and Commercial project execution.
•Determine and assess need for additional staff and/or consultants and recommending.
•Monitoring construction and procurement process, Controlling cost.
•Act as Contract Administrator utilizing the bill approval authority.
•Analyzing performance evaluation data (Approval related) of Company Heads and Departmental Heads and forwarding summary to the top management.
•Evaluate vendor performance utilizing the MIS database and other relevant information along with credit line and contract compliance.
•Act as active member of following bodies:
– Labor Contract Selection Committee (LCSC);
– Research and Development Body (R & D);
– MIS;
– – Financial Policy and Regulation Body;
– Pre-Auditor for Payments;
– Lead Auditor for Work and Process Quality and Compliance;
– Construction Monitoring, Evaluation and Control Body. -
Steel-X Ltd./ Mammut Building Systems FZC
-
2012-2013
Head of Planning and Implementation
Responsible for Project Planning, Project Management, Construction Management and Project Delivery for all (Turnkey Industrial) Projects of the Company.
Activities:
———
-Schedule the project in logical steps and budget time and finance required to meet deadlines.
-Determine labor requirements and dispatch workers to construction sites.
-Inspect and review projects to monitor compliance with building and safety codes, and other regulations.
-Interpret and explain plans and contract terms to administrative staff, workers, and clients, representing the owner or developer.
-Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors.
-Direct and supervise workers.
-Study job specifications to determine appropriate construction methods.
-Select, contract, and oversee workers who complete specific pieces of the project.
-Requisition supplies and materials to complete construction projects.
-Prepare and submit budget estimates and progress and cost tracking reports.
-Develop and implement quality control programs.
-Take actions to deal with the results of delays, bad weather, or emergencies at construction site.
-Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.
-Plan, organize, and direct activities concerned with the construction and maintenance of structures, facilities, and systems.
-Evaluate construction methods and determine cost-effectiveness of plans.
-Communicating with people outside the organization, representing the organization to customers, the public, government, and other external sources in verbal, in writing, or by telephone or e-mail.
-Estimating sizes, distances, and quantities; or determining time, costs, resources, or materials needed to perform a work activity.
-Certifying bills/IPCs submitted by suppliers and contractors. -
Steel-X Ltd./ Mammut Building Systems FZC
-
2012-2012
Manager, Planning and Implementation
Responsible for Implementation of all Projects and Defect Liability period Services/ Maintenance Services for the completed and handed over Projects of the Company.
Projects:
————
1. Cat Garments Co. Ltd., Comilla EPZ, Comilla (Japanese investor)2. Star Carpet Pvt. Ltd., Comilla EPZ, Comilla (Turkish investor)
3. Hashy Tiger Co. Ltd., Comilla EPZ, Comilla (Japanese investor)
4. C.G. Fashions Ltd., Adamjee EPZ, Narayanganj (Japanese investor)
5. Kaliachapra Sugar Mills (Garments Division), Nitol-Niloy Group, Pakondia, Kishoreganj
6. T.M. Textile and Garments( Canteen Complex), Kashor, Bhaluka, Mymensingh (Japanese investor)
-
Steel-X Ltd./ Mammut Building Systems FZC
-
2010-2012
Project Manager
-Responsible for Implementation as Resident Project In-Charge of Project Skyline of British American Tobacco Bangladesh Ltd., the 2nd Line GLT factory with Warehouse in Kushtia which included Civil, Steel, Plumbing and Electrical works in Turn Key basis and covering built up area of about 1,10,000 SFT, which was successfully handed over.
-Responsible for Implementation as Resident Project In-Charge of Project Vintage Denim Studio of ABA group the first LEED Certified Platinum rated Green Factory in Bangladesh, covering built up area of about 3,00,000 SFT which included one fully air-conditioned RMG building, one Washing Plant, one Utility Building, Heavy Duty Pavement, Light Duty Pavement, Workers Parade, Cycle Stand, Locker bay etc. in Turn Key basis.
-
MEPCL
-
2010-2010
Assistant Engineer
Works involved Design and Supervision of construction works of the project 1) Construction of BAPEX Building up to 12th-Floor with 20-storied foundation including two Basements of Petrobangla, GoB at Kawran Bazar, Dhaka., 2) Construction of National HRD Center Building with 2-Basements and including 20-storied foundation under Department of Public Health Engineering, GOB at Mohakhali, Dhaka
Activities:
——————
-The work involved assisting the Sr. Structural Engineer for Design Works for the Project.
– Assisted the Foundation Engineer in Design works of Foundation of the Project.
-Checking of setting out, piling works, pile load testing, checking of contractors concrete mix design, contractors` construction schedules for building works.
-To prepare the Interim Payment Certificate (IPC) with the help of Computer and checked the quantities. Interim Payment Certificate has been adjusted to respect of the rise or fall in the indexed costs of labor, fuel, materials and other inputs to works, by the application of a price adjustment factor. Detailed estimation of buildings and structural quantities and also preparation of variation order.
-Administered the different personnel engaged in Project, prepared working schedule, BoQ and coordinated material supply for Project.
-Supervision of major construction works.
-Construction work and material quality control.
-Communicated with different GOB departments for approval of the Project.
-Studying of Design and Drawings of Project and revised it with the coordination with the Senior Designer, Architect, and Client due to practical circumstances.
-Planning and management of ongoing Projects.
-Checking of Project Office Registers & Jr. Site Engineers` reports. Arrange monthly meeting with Engineers & Other Personnel related to the Project.
-Fire Fighting Plan and Design works.
-Preparation of EOI proposal and RFP proposals for this firm. -
Badhon Builders Co. Ltd.
-
2008-2010
Project Co-Ordinator
Duties/Responsibilities:
———————————
-Coordinating with/ Assist the Architect, Sr. Structural Engineer/ Consultant in Design works of different Building Projects.
-Checking of setting out Building Layout, piling works, pile load testing, checking of contractors concrete mix design, contractors construction schedules for building works.
-To prepare the Interim Payment Certificate (IPC) with the help of Computer and checked the quantities. Interim Payment Certificate has been adjusted to respect of the rise or fall in the indexed costs of labor, fuel, materials and other inputs to works, by the application of a price adjustment factor. Detailed estimation of buildings and structural quantities and also preparation of variation order.
-Administered the different personnel engaged in different building projects, prepared working schedule, BoQ and coordinated contractors for material supply of different projects.
-Supervision of major construction work of different building projects.
-Construction work and material quality control of different Projects.
-Communicated with different GoB departments for approval of the Project.
-Coordinated with DPDC, DESCO, DWASA and other organizations for electric and other utility line connection.
-Coordinated the works for supply and commissioning of Lift, Substations and Generators etc.
-Studying and interpretation of Design and Drawings of different building project and revised it with the coordination with the Experts due to practical circumstances.
-Planning and management of different building projects of this company.
-Checking of different projects Office Registers & Site Engineers reports. To arrange monthly meeting with Site Engineers & top management of this Company.
-Responsible for arranging , conducting and coordination of Total Training activities for Trainee Engineers sent from different Institutes for Industrial Attachment/ Field Training.