Description
CURRICULUM VITAE (CV)
Name: Jalal Ahmed
Mobile: +8801818482635
E-mail: jalal.spcl@gmail.com
¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬¬
Key Qualifications:
More than 11 years experience with operations & maintenance of gas Engines, 11/0.4KV & 11/132KV substation and 11KV & 0.440 KV switchgear, , capable of trouble shooting of the equipment’s and taking appropriate corrective & preventive actions with root cause analysis and recommending preventing actions to eliminate re-occurrences.
Also have enough knowledge GE Jenbacher JGS 620 GS-NL & Caterpillar M 3516 & G 3520C gas engine, 10 ton Boiler, reciprocating type air Compressor & Water treatment Plant.
Educational Qualification:
Bachelor of Science In Electrical & Electronics Engineering-2014
Atish Dipankar University of Science & Technology, Dhaka.
CGPA: 3.37 out of 4.00
Diploma-in-Electrical Engineering-2002
Comilla Polytechnic Institute
Bangladesh Technical Education Board, Dhaka.
First Division
Secondary School Certificate-1999
Harischar Union High School
Comilla, Board.
First Division,
Training:
Industrial attachment training course at Micro Electronics Limited Dhaka,
Operation and Maintenance of 1000 psig gas RMS (ZICOM, Singapore at Bangladesh plant site)
Operation and maintenance of GE gas Engine (GE, Austria at Bangladesh plant site)
Kaptai Hydro-electric Power Plant (320MW) & Rawsan Thermal Power Plant (420MW)
Computer capabilities:
Operating System: Windows XP/98/7/8
Office Packages: Microsoft Word, Microsoft Excel, Microsoft Power Point.
Languages:
Bengali: Excellent proficiency & English Good proficiency in all areas
Personal Information:
Name : Jalal Ahmed
Parents : Abdul Hakim
Amena Begum
Permanent Address : Vill: Shikaripara, Post: Vabookpara, P.S: Laksam, Dist: Comilla.
Present Address : Senior Engineer, Shahjibazar Power Company Limited.
Fathepur, Madhobpur, Habigonj.
Date of Birth : 9th August, 1983
Nationality : Bangladeshi
Marital Status : Married
Job Experience:
Name of Organization : Shahjibazar Power Company Ltd. (An Enterprise of Youth Group), 90MW Gas Engine Based Power Plant at Shahjibazar, Madhobpur, Hobigonj.
Position : Assistant Manager (Electrical).
Duration : From 3rd January, 2009 to till now.
Responsibilities:
I was engaged in supervising the work of Installation, Testing and Commissioning of Engine, Alternator, Transformer, Sub-station and all Electrical Systems.
Operation & Maintenance of Gas Generator (32 Nos.) Brand-GE Jenbacher – Austria.
>Engine Type JGS 620 GS-NL
>Rated Power 2902 KW
>Alternator AVK, 11KV
Ensuring operation & Maintenance of
11/132 KV Switch Gear (Brand-Energy Pac, Bangladesh)
>630A & 2500A VCB for 11KV Switch gear control.
>1250A & 2000A SF6 Gas Circuit Breaker (Brand-ABB) for 132 KV control.
>Protective relays 11KV & 132KV: Micom & Areva brand
>11KV & 132 KV CT. PT & 132 KV Lightening Arrestor
Ensuring operation & Maintenance of
Distribution & Power Transformer (Brand-Energy Pac, Bangladesh)
>1.5 MVA, 11/0.415 KV Distribution Transformer-4 nos
>30/35 MVA 11/132 KV Power Transformer -4 Nos.
>Buchholz Relay, pressure relief device, breathing system.
>On Load tap changer
Ensuring operation & Maintenance of 25 MMCFD RMS (By ZICOM, Singapore)
>Two stage regulation: 1st Stage 1000 psig to 340psig & 2nd Stage 340 to 60 psig.
>Gas Flow Meter (Brand-ABB USA,)
>Gas Analyzer (Brand ABB USA, Model-NGC 8206)
>Gas Heater (Brand-ZICOM, Model-ZWH-600-04-600-PL)
>Quick Opening Closure (Brand-Aerospace Energy, Model-KKT-18A)
Total produced energy, fuel, lube oil & gas consumption calculated Inventory & store.
Job Experience:
Name of Organization : Energy prima Ltd. (An Enterprise of Hosaf Group), 50MW Rental Power Plant, Kumargaon, Sylhet.
Position : Operation Engineer.
Duration : From 1st August 2008 to 31st December 2008.
Responsibilities:
I had engaged in supervising the work of Installation, Testing and Commissioning of Power plant, Sub-station and all Electrical power & control systems.
Operation & Maintenance of Gas Generator (27 Nos.) Brand Caterpillar by USA
>Engine Type G-3520C
>Rated Power 1950 KW
>Alternator Caterpillar 11KV 128A & 0.4KV 3517A
>Terberg Control System by Netherlands.
Ensuring daily operation and Schedule maintenance program of
>Jacket water & Lube oil refill or change
>Air filter, Oil filter, Gas filter, Spark plug clean or change
>Actuator rod end & Alternator bearing greasing are etc.
Operation and Maintenance of auxiliaries such as
> Cooling system (Radiator), Jacket water pump, Pre-lube pump, Air inlet system, Turbo charger
> Alternators, self starter, water treatment plant, Air compressor, D C source etc.
Maintain & analysis of operational log, records of plant overall achievement, Total produced energy, fuel, gas & lube oil consumption, operating status of equipments in sound and clear condition, Inventory & store.
Operation and Supervision of 132 KV Grid sub-station and switchgear equipments.
Job Experience:
Name of Organization : Bashundhara Tissue Industries Limited, (An Enterprise of Bashundhara Group) Anarpura, Gazaria, Munshigonj.
Position : Assistant Engineer (Generator).
Duration : From 29th June 2003 to 31st July2008.
Job Responsibilities:
I had engaged in operation, Maintenance, trouble shooting, and overhauling of 4.12MW power plant, 6MVA Sub-station and REB incoming 6MW.
Operation & Maintenance of Gas Generator (04 Nos.) Brand Caterpillar by USA
>Engine Type G-3516
>Rated Power 1030 KW
>Alternator Caterpillar 0.4KV
>Enercon Control System by Singapore
Operation, schedule Maintenance, and Troubleshooting of Distribution Transformer (Brand-Energy Pac, Bangladesh)
>3.0 MVA, 11/0.415 KV Distribution Transformer-2 no’s
Daily Operation and schedule works completed as
>Engine visually checked, Lube oil checked, cooling system checked, Air filter indicator checked, Battery charge & battery electrolyte level checked are etc.
>Daily shift diary analysis and any problem try to solve.
>Different types of schedule Maintenance completed.
Ensuring operation & Maintenance of 10 ton Clever Brooks Boiler (by USA), reciprocating type SPARRE Air Compressor & Water treatment Plant daily inspection & required work completed.
Successfully completed Top Overhauling of Genset.